SECTION VIII DIVISION 1 QUICK REFERENCE (Developed by Fayaz Memon)
Testing :
Hydrostatic : UG-99, UCI-99, UCL-52, Appendix 3 Pneumatic : UW-50, UG-100
Proof : UG-101
Non-Destructive :
Magnetic Particle : Appendix 6; UW-42; UW-50
Liquid Penetrant : Appendix 8; UNF-58; UHA-34; UW-42; UW-50 Ultrasonic : Appendix 12; UW-11(a)(7); UW-53
Impact : UG-20; UG-84; UCS-66; UHA-51; NF-6; UNF-65; UHT-5; UHT-6
Stamping and Reports : UG-115 thru UG-120 Manufacturer's and Product Standards : U-3; UG-11 Unfired Steam Boilers : UW-2(c); U-1(g)
Quality Control System : Appendix 10; UW-26
Radiographic Examination :
UW-11; UW-51; UCS-57; UNF-57; UHA-33; UCL-35 Spot examination of welded joint : UW-52
No radiograph : UW-11(c)
Inspection : UG-90 thru UG-97; U-1(j) Inspection Openings : UG-46

Notes
Design Pressure : UG-19; UG-21
Maximum Allowable Working Pressure : UG-98
Design Temperature : UG-19; UG-20
Vessels subject to direct firing : UW-2(d); U-1(h)
Relief devices : UG-125 thru UG-136; Appendix 11; Appendix M Repairs : UG-78; UW-38; UW-40(d); OF-37; UCI-78
Maximum allowable stress values :
UG-23; UW-12(c); UCS-23; UNF-23; UHA-23; UCL-23
Heat Treatment :
UG-85; UW-10; UW-40; OF-31; UCS-56; Table UCS-56; UCS-79(d) UCS-85; UNF-56; UHA-32; UHA-105; UCL-34
Joint Efficiency : UW-12; Table UW-12
Lethal Service : UW-2(a); UCD-2; UCI-2; UG-99(g)(4)
Loadings : UG-22
Low Temperature Service :
UG-84; UW-2(b); NF-6; UCS-65; UCS-66; UCS-67
UNF-65; UCL-27; Part ULT
Materials :
UG-4 thru UG-15; UG-18; UG-77; UCL-11; UW-5; Tables NF-1 thru NF-5